![]() |
Midshire Mainline v3 | ||
Type: | Layouts | ||
Downloaded: | 23754 | ||
File Size: | 8 MB | ||
File Type: | .cdp | ||
Created by: | nexusdj | ||
Date: | 24th May 2011 | ||
Version: | TS2009 SP4/TS2010 | ||
KUID2: | <KUID2:45317:100810:2> | ||
Description: **** VERSION 3 ***** Replaced unavailable content . Added new track makers at East end of mainline. Moved track markers away from buffers stops at Glauston Central Added additional lighting at Power station. Replaced missing point motors on double slip at Terminus. Track and signalling layout remains the same as in version 2 ******************************************************************************************************************************************* PLEASE NOTE TESTED IN 2010 COMPATABILITY MODE ONLY ******************************************************************************************************************************************* A reworked and extended version of fudginators West Coastal. This is an electrified mainline route running West to East with a spur to the city of Glauston, most content required can be found on the DLS. Route is fully signalled and is set up with Bloodnok's working AWS ramps.Includes 7 passenger active stations , 5 active industries , Extensive mainline running with 2 , 3 and 4 running lines with lines speeds up to 125 mph. With many thanks to Fudginator for allowing me to alter and resignal his already excellent route . Many thanks also to IC125 for his extensive testing of the route and it's AI capabilities. Contributors (Dependencies):
|